Recently Completed Project Gallery
GOURMET FOOD PARLOUR DUNSHAUGHLIN – Interior Fit out
Interior fit out works done for this high-end restaurant in Dunshauglin Co, Meath
KIPPURE ESTATE – Chandelier Installation
We were tasked with installing and powering a main centrepiece chandelier, consisting of 5 individually powered LED rings encased in gold protective structures. These were hung using suspension kits which were attached to a main ceiling rose. The ceiling rose had to...
MAYNOOTH BLOCK C BUSINESS PARK – EV charger installation
Installed EV Chargers at Maynooth Block C Business park Completed markings of car park spaces.
ACCOUNTING PRACTICE IN LUCAN – Flood control and Disaster Management
The Main water pipe burst in the ladies toilet (under the sink) and caused flooding in all the facilities. Our technicians were onsite immediately and stopped the leak. The office was operational after 24 hours. We did the following works and made sure that all the...
COLLEGE GATE (Cushman & Wakefield) – leak Detection & Waterproofing balcony
Balcony repairs carried out at College Gate. This included: removed balcony slabs and gravel Removed DPC membrane cleaned and dried the area sealed all the cracks with waterproof flexi seal applied primer painted with waterproof protector applied sealant installed new...
EXCHEQUER CHAMBERS – Roof repairs
Completed survey. Found valleys on the roof had deteriorated and were showing signs of water ingress. Replaced all the valley board and re-do the valleys with a fibre glass product to prevent future water ingress Replaced damage slates on the pitched roofs.
CAPITAL CREDIT UNION SUNDRIVE – Carpentry / Joinery
Work carried out at the main cashier’s desk. This desk was exposed to the cold elements during the winter months and caused a little discomfort for the Cashiers. We removed the old metal panel and installed a new 100mm insulated plasterboards. Plastered and re-painted...
EXCHEQUER CHAMBERS – Fire Audit
Remedial Works were carried out following the Fire Risk Assessment in the Exchequer Chamber Buildings. Works include Replacement of Fire Doors Installation of Passive vents in Basement area Fire proofing works Installation of fire ceiling
St Mary’s CCTV and Intruder Alarm installation
Supplied and installed wireless Intruder alarm and CCTV system. CCTVs installed at the following areas: > External, Front Door > External, Side Stairs to look at the rear door. > External Rear Yard above rear door. > Internal, Outside Comms Room. >...
4 TEMPLE PLACE – Apartment Refit
Renovation works carried out at 4 Temple Place Ranelagh. This included A relocation of the kitchen from its existing space. The generation of the space from a 1 bedroom upstairs to a 2 bedroom space. Full upgrade and re-wiring of the electricals. New upgrade and...